PROJECT TYPE | Pipeline Pulldown | TIME-FRAME | 2015 | |
CUSTOMER | Major pipeline operator | DURATION | Two days | |
LOCATION | Remote riser site |
Responsibly de-pressuring 36" diameter, high-pressure gas transmission pipeline to facilitate modifications.
Roska provided and installed a temporary 1,500 hp compressor and flanged piping. The Roska crew then safely de-pressured the pipeline and evacuated the gas to a downstream section of the pipeline without venting, achieving zero emissions.