PROJECT TYPE | Temporary gas compression for natural gas storage facility | TIME-FRAME | 2008 | |
CUSTOMER | Major infrastructure company | DURATION | Six months | |
LOCATION | Alberta |
Following delays in procuring equipment for its permanent facility, the customer was faced with losing an entire gas injection season and future business opportunities.
Roska supplied a complete design-build-operate solution including regulatory approvals and project management. Primary equipment was a 1,500 hp reciprocating compressor sourced from a strategic partner and modified to suit the project. Construction included trucking and cranes, equipment installation, electrical & instrumentation, and tie-in. Operation included commissioning/start-up, daily operation and maintenance for a period of five months.